Location
Denver, Colorado

SDG Services
  • Unique Problem Solved

Clear Creek Metro Sewer Plant


This project challenge was to design and construct an elevated jacking pit to facilitate the installation of 1180 lineal feet of 72 inch fiberglass reinforced concrete pipe inside the existing 78 inch steel pipe, without interrupting the existing flow.