Location
Montclair, Colorado

SDG Services
  • Unique Problem Solved

Montclair Storm Drainage



This project challenge was to design a unique spreader bar/lifting device with which the contractor's heavy excavator could remove the 42,000-pound box culvert section from the truck and move it into position for installation.